Separation engineering

Sludge calculator: loading, cake and disposal cost

Turn volume and concentration into an operating duty. Then compare wet cake mass at two cake-solids contents while keeping the same solids capture.

The starting values are an editable example, not predicted performance. Enter your analysis and net operating hours. Calculations run in this browser without sending your inputs.

1. Define feed and separation assumptions
2. Compare disposal cost · optional

Both cases use the same captured dry mass and disposal rate. This compares variable weight-based disposal charges only; it is not the net plant saving.

Formulas and units

V = daily volume; C = feed concentration; H = net hours; η = assumed solids capture; S = cake dry solids as a mass percentage.

OutputExpressionUnit
Feed dry solidsV × Ckg/d
Flow during feedingV / Hm³/h
Required dry-solids loading(V × C) / Hkg DS/h
Captured dry solidsV × C × η / 100kg/d
Wet cakeCaptured DS / (S / 100) / 1000t/d
Disposal difference(baseline t/d − scenario t/d) × €/t × days/y€/a

g/L and kg/m³ are numerically equivalent. Converting a feed mass percentage accurately requires density: kg/m³ = mass fraction × density in kg/m³. Do not enter 1% as 1 g/L.

Illustrative example

The same dry mass.
Fewer wet tonnes.

100 m³/d at 10 g/L carries 1,000 kg DS/d. Over 8 net hours this requires 12.5 m³/h and 125 kg DS/h. At an assumed 95% capture, cake receives 950 kg DS/d while 50 kg DS/d remains outside it.

At 20% cake solids: 4.75 t/d. At 15%: 6.33 t/d. An illustrative €100/t rate and 250 days/year give a gross disposal difference of €39,583/year. This excludes chemicals, energy, maintenance, investment, collection minimums and filtrate treatment.

Cake at 15% 6.33 t/d

Cake at 20% 4.75 t/d

Common wet-mass scale. Equal capture and dry-solids feed in both scenarios.

What the project needs to establish

  • Use a consistent analytical basis for feed, cake and filtrate; do not mix suspended and total solids without justification.
  • Conditioner-added solids are excluded. Include them in the cake balance where material.
  • Uncaptured dry solids is a mass, not a filtrate concentration or volume. Measure return flow and composition.
  • The tool calculates neither net savings nor payback. The disposal rate must represent your actual contract.
  • Measure simultaneous flows and concentrations to establish actual capture. Here, capture is an editable assumption.
Read the dewatering guides

Prepare an equipment selection with Neptuno

Send sludge volume, analysis, operating hours and cake destination. Include the calculation assumptions in your enquiry to review capacity, trials and supply scope.

Contact
Your project with Neptuno

Get a proposal for your project.

Tell us what you need to solve in your process. Start with the information you have.

We will review the application and explain the solution we can supply or the information needed to assess it.

Contactcomercial@neptunoes.comEmail water analyses, photographs and drawings to our sales address.
TECHNICAL CONTACT

Tell us about your project.

Tell us what you need and we’ll propose a solution.

Add process details (optional)

NEPTUNO WATER TECHNOLOGY SL will use your details to handle the enquiry. Your rights and further information are in the privacy policy.