Establish dry-solids loading and active dose
Calculate kg DS/h by multiplying sludge flow by solids concentration. Divide by 1,000 to obtain dry tonnes per hour. Multiplying t DS/h by kg active/t DS gives kg active/h. This prevents volume-based dosing from silently changing the dose when feed concentration varies.
Illustrative arithmetic only: 200 kg DS/h equals 0.200 t DS/h. If a sludge trial establishes 6 kg active/t DS for that sample, the requirement is 0.200 × 6 = 1.20 kg active/h. This assumed dose is not a recommendation for other sludges or installations.
Convert active material into commercial product
Assume a supplied product containing 40% active material by mass. Delivering 1.20 kg active/h requires 1.20 / 0.40 = 3.00 kg product/h. At a declared product density of 1.05 kg/L under the relevant conditions, commercial-product flow is 3.00 / 1.05 = 2.86 L/h.
Check the technical data sheet: some consumption figures refer to the product as supplied rather than its active content. Compare quotations and records on the same basis. Check the pump’s delivered flow as well; a percentage speed setting does not establish actual litres per hour.
Calculate prepared solution and added water
For a solution containing 0.20% active polymer by mass, the active fraction is 0.002. Final solution mass flow is 1.20 / 0.002 = 600 kg/h. With 3 kg/h of supplied product, approximately 597 kg/h of additional water is required.
Only with an assumed solution density of 1 kg/L can 600 kg/h be treated as 600 L/h. Do not subtract the product’s 2.86 L/h from a balance expressed in kg/h. State whether the preparation percentage refers to active polymer or supplied commercial product.
Check preparation, maturation and final injection
The calculated flow must be prepared and matured according to the chemical supplier’s instructions. Check usable compartment volumes, batch sequencing and operating autonomy. If secondary dilution occurs before injection, include it in the final hydraulic flow without counting the active polymer a second time.
Check the full operating range: a pump sized for peak demand may dose inconsistently at low loading. Include available pressure, water quality, temperature and any emulsion-inversion or powder-dissolution conditions required by the selected formulation.
Verify the calculation against measured consumption
Compare product mass consumed over a defined period with the dry tonnes actually fed. At known activity, this provides a check on average active consumption and highlights concentration, calibration or inventory errors. Use matching time intervals and separate transitional trial conditions from stable operation before interpreting the result.
Common questions
Are six kg of product equivalent to six kg active?
Only for a product that is 100% active. At 40% activity, six kg of commercial product contains 2.4 kg active material.
Can every polymer be prepared at 0.20%?
No. That concentration is an assumption in the example. Preparation must suit the formulation and equipment, follow supplier instructions and be validated in operation.